| After twenty years of wishful thinking, Breckenridge | | | | restaurant and other facilities. |
| will finally move forward and build the Gondola in | | | | The town of Breckenridge also plans on diverting |
| Spring of 2006. This project should be completed by | | | | traffic off of Main St. with a hope to preserve the |
| Christmas of 2006. The Breckenridge Gondola will fit | | | | old town main street look and feel. There is a lot |
| up to 8 people and will load right in the free skier | | | | going on in Breckenridge right now and next year at |
| parking lots. The path of the Gondola will travel | | | | this time, you will see a complete transformation. |
| through the Shock Hill neighborhood and on to both | | | | The new Breckenridge Gondola will have a capacity |
| Peak 7 and Peak 8 base areas. | | | | of 3,000 riders per hour, 143 cabins, 7,843 ft. in |
| The Gondola Project is part of a much larger plan | | | | length, 25 towers, 2 mid stations at Shock Hill and |
| that started last year when they built the Imperial | | | | Peak 7 base area, 7.5 minute ride from the transit |
| Express ski lift and extended a skiing trail directly to | | | | center to Peak 8 terminal. |
| the free skier parking lots. Next on the list will be an | | | | We can't wait to see you out here! |
| expansion of the Peak 7 base area to include a | | | | Enjoy your ski vacation in Breckenridge, CO. |